• Electrical Engineer III

    TECO Energy (Ruskin, FL)
    …to the members of the Energy Supply staff regarding technical feasibility and engineering studies as they relate to the Energy Supply area. Responsibilities will ... our generating facilities. Use of new technologies and utilizing new engineering techniques and tools is an ongoing responsibility. **DUTIES AND RESPONSIBILITIES:**… more
    TECO Energy (08/07/25)
    - Related Jobs
  • Aems/DTS Engineer (Varies)

    TECO Energy (Tampa, FL)
    …these locations. **POSITION CONCEPT** The Engineer - AEMS is responsible for engineering support and expertise for the Advanced Energy Management System (AEMS) for ... the Energy Control Center and will require frequent coordination with engineering groups, IT Applications Support, and other operational support organizations.… more
    TECO Energy (08/07/25)
    - Related Jobs
  • Engineer - Asset Management, Varies

    TECO Energy (Apollo Beach, FL)
    …different levels:** + **Engineer II** + **Engineer III (Senior Engineer)** + ** Engineering Fellow** **POSITION CONCEPT** Engineers in Asset Management work with grid ... oversees major maintenance, and provides technical guidance on electrical engineering and regulatory standards. Key responsibilities include working with generators,… more
    TECO Energy (08/07/25)
    - Related Jobs
  • Protection and Control Engineer (Varies)

    TECO Energy (Tampa, FL)
    …I is required in this position_** **_._** _POSITION CONCEPT_ _Provides engineering and operations support for substation protection and control. Additionally, ... system requirements. (15%)_ 2. _Represent and coordinate the various Substation Engineering projects within Electric Delivery's Project Management process. (15%)_ 3.… more
    TECO Energy (08/07/25)
    - Related Jobs
  • Structural Designer - Power Providers Job Details…

    Black & Veatch (Coral Gables, FL)
    …improvement and change management efforts + Reviews design inputs in order to ensure consistency + Assists to ensure deliverables are in compliance with ... 100 years of innovation in sustainable infrastructure and our expertise in engineering , procurement, consulting and construction, together we are building a world of… more
    Black & Veatch (07/24/25)
    - Related Jobs
  • Senior Substation Designer Job Details | Black…

    Black & Veatch (Frostproof, FL)
    …the project + Demonstrates personal accuracy and drives continual improvement and change management efforts Engineering Production: + Applies basic ... 100 years of innovation in sustainable infrastructure and our expertise in engineering , procurement, consulting and construction, together we are building a world of… more
    Black & Veatch (07/19/25)
    - Related Jobs
  • Lead Hardware Engineer / Mid-Career Level

    Lockheed Martin (Orlando, FL)
    …\- Working knowledge of Agile terms and methodologies \- Experience with Engineering Change Control Processes **Security Clearance Statement:** This position ... is dedicated to pushing the boundaries of technology and engineering excellence\. Be part of the OneLM Team where...\- 30 days of the requisition posting date in order to receive optimal consideration\.** At Lockheed Martin, we… more
    Lockheed Martin (07/19/25)
    - Related Jobs
  • Model-Based Systems Engineer

    Lockheed Martin (Cape Canaveral, FL)
    …systems thinking skills to solve very complex problems and implement constructive change * Electrical engineering or Mechanical engineering experience ... for you\. Systems Engineer responsible for contributing to Model\-Based System Engineering \(MBSE\) implementation for the Fleet Ballistic Missile \(FBM\) Common… more
    Lockheed Martin (07/12/25)
    - Related Jobs
  • Structural Transmission Line Designer Job Details…

    Black & Veatch (Coral Gables, FL)
    …improvement and change management efforts + Reviews design inputs in order to ensure consistency + Assists to ensure deliverables are in compliance with ... 100 years of innovation in sustainable infrastructure and our expertise in engineering , procurement, consulting and construction, together we are building a world of… more
    Black & Veatch (07/08/25)
    - Related Jobs
  • Lead Specialist - Configuration Management

    GE Aerospace (West Melbourne, FL)
    **Job Description Summary** At GE Aerospace, engineering is at the center of what we do, and we are looking for talented, innovative engineers who can help us design ... flight, this is the opportunity for you. Locations in order of preference: Grand Rapids, MI, Clearwater, FL or...not an IT position. This role is centered on engineering configuration management and data delivery activities, not software… more
    GE Aerospace (08/07/25)
    - Related Jobs