• Production Planner

    WATTS (Franklin, NH)
    …reputation - and we have a dynamic future ahead.​ The Finite Production Planner is responsible for creating a detailed, time-phased production plan by SKU and ... by line at the shift, hour, and minute level , tailored to the specific requirements of the assets...the specific requirements of the assets in scope. The Planner balances required and available capacity to optimize service… more
    WATTS (01/16/26)
    - Related Jobs