• Engineering Change Order

    ManpowerGroup (Milpitas, CA)
    Our client, a leader in the medical device industry, is seeking an Engineering Change Order Analyst to join their team. As an Engineering Change ... skills which will align successfully in the organization. **Job Title:** Engineering Change Order Analyst **Location:** Milpitas, CA **Pay Range:** **What's… more
    ManpowerGroup (07/16/25)
    - Related Jobs
  • Engineering Change Specialist

    Insight Global (Fremont, CA)
    …closure Performs documentation research for all parts/assemblies to be included in the Engineering Change Order to ensure accuracy, completeness, and ... PMs (New Product Introduction Program Managers) on a daily basis for Engineering Change Order activities Interfaces with Engineers and Designers on design… more
    Insight Global (07/21/25)
    - Related Jobs
  • Manufacturing Engineering

    Ralliant (Boxborough, MA)
    …to drive to root cause / corrective action for any escapes. + Support the Engineering Change Order (ECO) system from generation through implementation. + ... Factory Manager 5/8/2025 **Supervises** **Travel Frequency (%)** **Location** Manufacturing Engineering Technician 10% Boxborough **Purpose of Position:** Gems Setra… more
    Ralliant (07/02/25)
    - Related Jobs
  • Engineering Project Coordinator

    Advanced Energy (Fort Collins, CO)
    …people are expeditiously advised of changes to materials + Work implementation dates on Engineering Change Order (ECO) to meet design needs and minimize ... with planners and material program managers. + Assist Design Engineering (DE) to process change orders in the Enterprise Resource Planning- IPRO (ERP) system.… more
    Advanced Energy (08/07/25)
    - Related Jobs
  • Senior Laser Development Engineer…

    Teledyne (Bozeman, MT)
    …Product Introduction Process + Oversee Configuration Management System + Familiar with standard Engineering Change Order Processes + Develop and mentor ... design trades and analyses on development projects. Some mechanical engineering skills required, relating to military-grade opto-mechanical systems. **Duties and… more
    Teledyne (07/22/25)
    - Related Jobs
  • Senior Designer

    Pentair (Manitowoc, WI)
    Engineering documents such as Engineering Change Request's (ECR's), Engineering Change Order / Engineering Change Notice's (ECO/ECN's), ... with prototyping, to working with a cross-functional team in order to drive an idea from concept to production....product structure in business ERP systems, and manage the Engineering Change processes. + Assist a degreed… more
    Pentair (08/08/25)
    - Related Jobs
  • New Product Introduction Coordinator

    Advanced Energy (Wilmington, MA)
    …are expeditiously advised of changes to materials + Work implementation dates on ECO ( Engineering Change Order ) to meet design needs and minimize scrapping ... create and maintain Bill of Material (BOMs) + Process Change Orders in the ERP (Enterprise Resource Planning) system...Order ) to drive demand on the factories for Engineering evaluation units + Support DE (Design Engineering more
    Advanced Energy (08/07/25)
    - Related Jobs
  • Inspection C - Quality Inspector

    L3Harris (Anaheim, CA)
    …to the assembly for correct part number, drawing, revision, as-required approval(s), and Engineering Change Order (s). + Perform visual inspection of ... Rework documentation, test data, etc. + Verify assembly work order test results for completeness and correctness to the...able to interpret/ follow documents such as: Drawings, Procedures, Engineering Change (EOs) Work Orders and Work… more
    L3Harris (07/15/25)
    - Related Jobs
  • Sustaining Engineer - 2nd Shift

    WATTS (Fort Worth, TX)
    …standardization for configuration and management simplicity. + Manage and prioritize the Engineering Change Order and Product Improvement processes, ... engineering and/or production validations as required. + Utilize the Engineering Change Order and Deviation processes to coordinate across Planning and… more
    WATTS (08/09/25)
    - Related Jobs
  • F-16 Avionics Sustainment Support Senior (Level 3)

    Lockheed Martin (Hill Air Force Base, UT)
    …all sustainment actions, modifications, and upgrades\. * Assist Engineering on any required Engineering Change Order \(ECO\) that may be affected and in ... Coordination Group \(TCG\); this includes the development of Country\-Specific Technical Order \(CSTO\) and Country\-Specific Time Compliance Technical Order more
    Lockheed Martin (07/18/25)
    - Related Jobs