- Ameren (Steedman, MO)
- … Risk Assessment Engineer develops, maintains, and applies nuclear power plant probabilistic risk assessment ( PRA ) models to support safe and ... PRA . Participate in plant program groups that use risk insights, such as the Maintenance Rule Expert Panel....accredited program is required. Three or more years in Probabilistic Risk Assessment ( Probabilistic… more
- Dominion Energy (Glen Allen, VA)
- …level engineer in PRA . Position will be filled commensurate with applicant experience.** Probabilistic Risk Assessment ( PRA ) is part of the Nuclear ... Engineer (Associate to Staff) - Probabilistic Risk Assessment -...PRA has responsibility for developing, maintaining, and applying probabilistic risk models to support Dominion Energy's… more
- System One (Bellevue, WA)
- …part of an integrated team, ensuring safety compliance. + PRA Application: Apply Probabilistic Risk Assessment ( PRA ) knowledge through the LMP ... System One is seeking to hire a LMP PRA Safety Case SME for a 9-month contract...a position focused on the application of NEI 18-04, " Risk -Informed Performance-Based Technology Inclusive Guidance for on-Light Water Reactor… more
- Actalent (Rockville, MD)
- …criteria. + Assist teams in performing risk and hazard assessments such as probabilistic risk assessment ( PRA ), failure modes effects analysis ... throughout project life cycles, as well as developing and implementing risk -informed performance-based (RIPB) design criteria. Responsibilities + Develop plant site… more
- Amentum (Aiken, SC)
- …Requirements (TSRs), fuel shipping container Safety Analysis Reports for Packaging (SARP), and Probabilistic Risk Assessment ( PRA ). Perform analysis, ... testing, and research to support the projects. Application of the USQ process Perform research and/or testing needed to validate safety analysis assumptions or controls. **Basic Qualifications:** A BS degree in engineering or a related field with 5 or more… more
- Vistra (Shippingport, PA)
- …nuclear fleet. PRA has responsibility for developing, maintaining, and applying probabilistic risk models to support VISTRA nuclear plants in Ohio, ... PRA Applications - Perform analysis using the PRA models to support regulatory and elective risk... PRA models to support regulatory and elective risk -informed programs and applications (NFPA 805, Surveillance Frequency Control… more
- GE Vernova (Wilmington, NC)
- …identification and quantification of inputs for all modes and all hazards probabilistic risk evaluations, development and communication of insights for selection ... designs, and implementation of final plant designs into rigorous probabilistic risk models in support of licensing...+ Experience in Licensing Modernization Process and other current risk informed regulatory topics. + Experienced in PRA… more
- GE Vernova (Wilmington, NC)
- …maintainability, inspect'ability (RAMI) goals using failure mode and effects analysis (FMEA), probabilistic risk analysis ( PRA ), and similar techniques. + ... completeness, and compliance with requirements. + Lead technical optioneering and assessment studies, root cause analyses, design reviews, etc. + Ensure work… more
- GE Vernova (Wilmington, NC)
- …and maintainability (RAM) goals using failure mode and effects analysis (FMEA), probabilistic risk analysis ( PRA ), and related modern techniques. ... compliance with requirements. + Perform optioneering or trade-off studies for technical, risk , and cost optimization + Prepare detailed work plans covering scope,… more