• Production Control Planner

    Leidos (San Diego, CA)
    …**Your greatest work is ahead!** Leidos' Defense Systems Manufacturing Segment is seeking a ** Production Control Planner III ** to join our Defense ... execution activities to ensure program milestones are achieved. The Planner III is responsible for metrics management,...on scheduling and order status. + Mentor and guide Production Control Planner I/II team… more
    Leidos (01/07/26)
    - Related Jobs
  • Production Control III

    Safran (Everett, WA)
    …field / Job profile** Supply chain - Mps planner **Job title** Production Control III **Employment type** Permanent **Professional category** Employees / ... Production Control III **Job details** **General information** **Entity** Safran is an international high-technology group, operating in the aviation… more
    Safran (01/06/26)
    - Related Jobs
  • Production Planner /Scheduler…

    Graphic Packaging International, LLC (Fort Smith, AR)
    Production Planner /Scheduler III Requisition ID: 12397 Location: Fort Smith, AR, US, 72923 Department: Manufacturing & Operations Travel: No Travel Required ... Customer Service team. **ESSENTIAL DUTIES & RESPONSIBILITIES:** + Direct support to Production Control Manager, Department Manager, and New Business initiatives.… more
    Graphic Packaging International, LLC (12/05/25)
    - Related Jobs
  • Production Planner III

    Lockheed Martin (Courtland, AL)
    …employee\. Our facility in Courtland, Alabama has an immediate opportunity for an experienced, Production Planner III to join our mission\. In this role, ... highly technical build cycle and be responsible for the production planning of one or multiple Program Make Parts\....Monitoring of material usage * Exception message monitoring and control * Review and analysis of critical path items… more
    Lockheed Martin (10/22/25)
    - Related Jobs
  • Mfg/ Production Planner III

    General Atomics (Tupelo, MS)
    …individuals to apply. **Job ID#:** 52622BR **Job Category:** Material and Production Control **Travel Percentage Required:** 0% - 25% **Full-Time/Part-Time:** ... **Clearance Required?:** No **Pay Range High:** 105,533 **Recruitment Posting Title:** Production Planner **Job Qualifications:** + Typically requires a… more
    General Atomics (12/16/25)
    - Related Jobs
  • Environmental Planner Remediation I, II,…

    Tri-State Generation and Transmission Association, Inc. (Westminster, CO)
    …job grade 7; Environmental Planner (Remediation) II, job grade 8, Environmental Planner (Remediation) III , job grade 9; or Senior Environmental Planner ... Planner (Remediation)** Hiring Salary Range: $109,000-139,000 **Environmental Planner (Remediation) III ** Hiring Salary Range: $98,000-$124,000… more
    Tri-State Generation and Transmission Association, Inc. (01/05/26)
    - Related Jobs
  • Manufacturing Engineer Resource Planner

    Textron (Fort Worth, TX)
    **Manufacturing Engineer Resource Planner III \- MTC 1st shift** **Description** **Job Description:** * Under the general supervision of a supervisor or an ... employee of equal or higher rank, Mfg\. Eng\. Resource Planner III is responsible for administering effective...\(drawings & **modeling\)\.** * Must have knowledge of shop production and processing operations\. * Work in accordance with… more
    Textron (01/08/26)
    - Related Jobs
  • Mfg Eng Resource Planner III

    Textron (Fort Worth, TX)
    **Mfg Eng Resource Planner III ** **Description** Summary of Work Performed: Under the general supervision of a supervisor or an employee of equal or higher rank, ... Mfg\. Eng\. Resource Planner III is responsible for administering effective...instructions \(drawings & modeling\)\. Must have knowledge of shop production and processing operations\. Work in accordance with management… more
    Textron (12/03/25)
    - Related Jobs
  • Manufacturing Engineering Resource Planner

    Textron (Fort Worth, TX)
    **Manufacturing Engineering Resource Planner III \- DSC** **Description** **Summary of Work Performed:** Under the general supervision of a supervisor or an ... employee of equal or higher rank, Mfg\. Eng\. Resource Planner III is responsible for administering effective allocation of manufacturing resources for process… more
    Textron (11/19/25)
    - Related Jobs
  • Manufacturing Engineering Resource Planner

    Textron (Fort Worth, TX)
    **Manufacturing Engineering Resource Planner III \- ROC** **Description** **Summary of Work Performed:** Under the general supervision of a supervisor or an ... employee of equal or higher rank, Mfg\. Eng\. Resource Planner III is responsible for administering effective allocation of manufacturing resources for process… more
    Textron (11/12/25)
    - Related Jobs